We’re slow at work so I figured I could get an entire day un interrupted at the wood pile. Got A couple hours worth of splitting stacked up from a week or two ago. According to the hour meter on the splitter I split 2.4hours today. Got all that stacked. Then went to my dads house and got a load of wood from there. Unloaded it then brought some more wood into the cellar till I couldn’t see.
Very productive day but I’m gonna pay for in the morning. Whole front row is the start for next year. Pile is almost 6 feet high. I usually burn the front and back row in one winter. Maybe a little will be left over at the end.
Also my oldest daughter came by for an hour so too so That was nice to see her.
Various pics throught the day in no particular order. I should have took one before I started but you get the idea.
Very productive day but I’m gonna pay for in the morning. Whole front row is the start for next year. Pile is almost 6 feet high. I usually burn the front and back row in one winter. Maybe a little will be left over at the end.
Also my oldest daughter came by for an hour so too so That was nice to see her.
Various pics throught the day in no particular order. I should have took one before I started but you get the idea.
Attachments
-
FA1EAE13-A8C4-4AC4-B511-7D0F7FD333CF.jpeg5.1 MB · Views: 67
-
63A27DB9-C470-493E-B7B4-0DB885922FCE.jpeg6.6 MB · Views: 64
-
CA06BC70-0C7D-41F7-92FB-761769132C3F.jpeg4.2 MB · Views: 66
-
A3C5D45F-EBA3-4055-AB6E-2F1B52E8B544.jpeg3.7 MB · Views: 62
-
C7FED9B6-5B56-4B29-851A-9B7E2BA1A9C3.jpeg6.7 MB · Views: 60
-
01D24B2B-63F4-41C3-8F7E-94996F3EEB12.jpeg6.2 MB · Views: 61