We are planning our bandmill, and I am contemplating a maybe stupid, maybe brilliant aproach to making the first cuts level (by lifting the thinner part of the trunk).
So I was thinking about a hydrolic chain of a couple hydrolic jacks/lifter (every meter or so) but leave the lifter in the end or start.
The trunk will have an even force on every lifting spot. To prevent any unexpected tention in the log.
The logs are mostly 5 till 6 meters long.
After the trunk is level, close all hoses, and start milling.
Did somebody already try this?
Verstuurd vanaf mijn SM-G955F met Tapatalk
So I was thinking about a hydrolic chain of a couple hydrolic jacks/lifter (every meter or so) but leave the lifter in the end or start.
The trunk will have an even force on every lifting spot. To prevent any unexpected tention in the log.
The logs are mostly 5 till 6 meters long.
After the trunk is level, close all hoses, and start milling.
Did somebody already try this?
Verstuurd vanaf mijn SM-G955F met Tapatalk