When I was in my 20's worked with a engineer who was on the team clearing the reservoir.
Said he helped take a track off each of 4 brand new D9s and mate 2 of them which were used to drag the ball and cabled chain.
I've found videos of the ball and cable, but not of the mated D9s.
Anyone have a link, or old enough (y'd have to be over 80 yo <G>) to recall any details ?
Said he helped take a track off each of 4 brand new D9s and mate 2 of them which were used to drag the ball and cabled chain.
I've found videos of the ball and cable, but not of the mated D9s.
Anyone have a link, or old enough (y'd have to be over 80 yo <G>) to recall any details ?