I'm actually down a saw and yep got the machine back together. Ended up needing a new flywheel and some other crap. About two grand in parts and nearly two weeks down. I had wrong parts sent to me and lots of bull#### customer service from the parts people at Cummins. When I wasn't playin grease monkey I cut a good chunk of the next job. Got to skidding on it today.
Block face sizwheel with the far side cut off. This pic was from a couple of months ago.
This was what I packed in for a short day of cutting at the end of a job. Typically I'd have 1.5 to 2 gallons of mix and another gallon of water depending on how hot it is. The metal bottles go on my wedge belt. Extra chains in the pack. T.P. Spark plug. Couple of tools. Extra wedges. Starter cord. Electrical tape. Extra ear plugs. Extra gloves. Lunch. Snack. The winter pack gets heavier. That pack along with the short bar means I almost never have to pack out to the truck while cutting. Its tough to make money when you are walking around looking for things.
View attachment 306728
View attachment 306729