I had an 83 year old gal, yes 83, that has been a customer for two years make an obvious play for me today...obvious now. The hell of it is she is not that bad looking. Unbelievable for 83.
Dude don't be stealing my sugar mamma!!!I had an 83 year old gal, yes 83, that has been a customer for two years make an obvious play for me today...obvious now. The hell of it is she is not that bad looking. Unbelievable for 83.
We get about 10k yards of brush chips into our yard from our crane removal crew in a year but our real yardage comes from the grinding of logs. We also let tree services/landscapers dump @45 to 60 bucks a load for a one ton dump/dump trailer. I can't even think of a way to calculate how many yards we have in our piles.. two years ago we had a contract to supply something like 15k yards to one of our big landscape contractors and we still had half our pile left after that. We make zero effort to get material and zero effort to sell. It comes in on its own and people call to order loads. Landscapers dump their load of brush and leave with a full load of mulch, they pay us on both ends! It's a vicious cycle but people keep coming.
Sent from my SM-G900T using Tapatalk[/QUOTE
I
ive noticed a lot of the same things. The biggest problem I have now is delivering I'm ordering some hooklift triaxles pretty soon.We get about 10k yards of brush chips into our yard from our crane removal crew in a year but our real yardage comes from the grinding of logs. We also let tree services/landscapers dump @45 to 60 bucks a load for a one ton dump/dump trailer. I can't even think of a way to calculate how many yards we have in our piles.. two years ago we had a contract to supply something like 15k yards to one of our big landscape contractors and we still had half our pile left after that. We make zero effort to get material and zero effort to sell. It comes in on its own and people call to order loads. Landscapers dump their load of brush and leave with a full load of mulch, they pay us on both ends! It's a vicious cycle but people keep coming.
Sent from my SM-G900T using Tapatalk
View attachment 559715 More fun and games.
You are nutz,,
Can I come!
Jeff
I did a burn the other day. I had built a tall 4 foot high, 3 sided enclosure with the concrete fence posts stack on their sides so the holes would allow air flow. Also some where broken and had chunks missing so they worked good. I put some whole ones on top and layed old garden fencing on it to stop sparks. Burn a love seat in 5 minutes, a TV in 8, a big blue tarp in under a 60 seconds. I pulled a perfect mesh tarp out of the dump pile, its one of those really tough kind. I don't know why some idiot would have thrown it away. Its huge.
Opened up a bunch of ground, spread chips and installed firewood cribs. These bed liners are great. I strung more garden fencing around them and have plastic pallets.
At least I offered to help!
Jeff
View attachment 560021 View attachment 560022 View attachment 560023 View attachment 560024 View attachment 560025 View attachment 560021 View attachment 560022 Took down a 30" diameter white oak , did it over 2 days ( don't get out of college till 1) going back tomorrow to clean up the last bit of trunk wood!
Enter your email address to join: