Got all dressed and headed for the woodpile to continue with the splitting project. Got shortstopped to sort out this mess:
There was a 4x6 running between the RR ties up near the top holding the tops of the 2x4s. Guess it was pretty good construction as it held for around 25 years. Mistake was not morising the 4x6 in deep enough (only about an inch). One (or both) of the ties must have shifted.
Aftermath - still some cleanup to do:
Probably still be some coming down for a day or two.
Harry K
There was a 4x6 running between the RR ties up near the top holding the tops of the 2x4s. Guess it was pretty good construction as it held for around 25 years. Mistake was not morising the 4x6 in deep enough (only about an inch). One (or both) of the ties must have shifted.
Aftermath - still some cleanup to do:
Probably still be some coming down for a day or two.
Harry K