dparkguy
ArboristSite Lurker
I do know all this work will be worth it when I fire the OWB up and can heat my entire house and garage. BUT, installing the underground lines darn near made me go nuts. 6 hours digging a 5' long tunnel under a driveway, 2 hours Friday with a 6" x 36" tracked trencher, 5 hours Saturday cleaning out the trench and 8 hours Sunday prepping and installing the pipe. I included some pics showing what steps I took in installing the pipe. The entire pipe was wrapped and sealed with heavy duty billboard fabric. I then took 4'x8' sheets of EPS insulation and ripped them in 6" wide strips. I wrapped and sealed the insulation in another piece of billboard fabric creating an 8"x8" package. Turned out very nice and I'm hoping for very little heat loss.