NYTREECLIMBER
Addicted to ArboristSite
Awesome
Character is who you are when no one is looking
Character is who you are when no one is looking
This one is on a 92 chassis L8000 with interlock axels, newer cat motor with 34K miles. New hydraulic pump. Boom is a 25T 96. With 92 main, and an additional 28-52 of jib. Its in really nice shape.Nice looking unit ! Congrats. I'm going tomorrow to look at a rear mount national. It's an older unit 17 ton with 95' of boom.
Sent from my iPhone using Tapatalk
This one is on a 92 chassis L8000 with interlock axels, newer cat motor with 34K miles. New hydraulic pump. Boom is a 25T 96. With 92 main, and an additional 28-52 of jib. Its in really nice shape.
Must've been tired after that one. Gotta have a good rope man on those tight squeezesJob we did thurs and fri
Must've been tired after that one. Gotta have a good rope man on those tight squeezes
Character is who you are when no one is looking
Must've been tired after that one. Gotta have a good rope man on those tight squeezes
Character is who you are when no one is looking
Here, see if this works..
what cat motor did they use in the 92 8000's?This one is on a 92 chassis L8000 with interlock axels, newer cat motor with 34K miles. New hydraulic pump. Boom is a 25T 96. With 92 main, and an additional 28-52 of jib. Its in really nice shape.
Would've been nice to use the crane on that one eh
Character is who you are when no one is looking
what cat motor did they use in the 92 8000's?
This job was in Cambridge on the Harvard campus directly on Memorial Drive. Between police details, and the cost of a crane big enough it would have probably added 50% more to the cost of the job. As it was I charged 3800 + a sidewalk occupancy permit for my chip truck.
Say whaaaat? How much did you have to pay to park your truck and chipper for two days? Over 4k? That's nuts man
That sounds better.No No. I charged $3800 for my fee. The parking permit and running around time came to $200, which the client is responsible for. All together the removal cost him $4000. Tree work in the city is fahkin expensive man.
More Balls than the little bucket ehh !! That truck looks great, I know it will work out great for you.DB, I have to check on that. Its a big ass motor though. And I also could be wrong. Truck is speed governed at 65, and it does that going up hill no problem. Has balls.
More Balls than the little bucket ehh !! That truck looks great, I know it will work out great for you.
You can be horizontal at full extension and raise up without retracting. I guess that's supposed to be impressive on an older unit crane.
No No. I charged $3800 for my fee. The parking permit and running around time came to $200, which the client is responsible for. All together the removal cost him $4000. Tree work in the city is fahkin expensive man.
As well it should be. I wandered into Boston one time on a road-vacation. I got trapped downtown, couldn't go anywhere. No parking at all, nothing but a traffic congested mess.
I got out as soon as I could. I cannot imagine how unprofitable it would be to drive a heavy truck around in that mess. You would lose anything resembling normal profits just trying to get to the job and back.
Enter your email address to join: