MikeInParadise
ArboristSite Guru
me access the wood up the hill behind the creek on the woodlot with my old Terra Jet.
I have been underbrushing this week so I will have an idea of where to cut the trail so that the old jet can get up and down the hill.
This will let me finally get at the wood I want to mill up at the back of the hill. Still lots more work to get the trail in to the top of the hill but it is a start.
I was going to mill wood for this but ended up buying a load of culled lumber from the depot about 1/3 price and you just could not beat that.
Two 6 x 12 bridges for $140 worth of wood. The components for the other bridge are ready to go but I don't have the concrete piers installed yet.
I have got another days work on building up the approaches to the bridge.
I have been underbrushing this week so I will have an idea of where to cut the trail so that the old jet can get up and down the hill.
This will let me finally get at the wood I want to mill up at the back of the hill. Still lots more work to get the trail in to the top of the hill but it is a start.
I was going to mill wood for this but ended up buying a load of culled lumber from the depot about 1/3 price and you just could not beat that.
Two 6 x 12 bridges for $140 worth of wood. The components for the other bridge are ready to go but I don't have the concrete piers installed yet.
I have got another days work on building up the approaches to the bridge.