Czech_Made
ArboristSite Operative
Yesterday I cleaned up some of the milled wood, first on jointer, than pushed it through planer.
It made me realize that I am maybe too generous while milling. For 1" board I move the log up 1 3/8" since the chain kerf takes 3/8", the idea was to have 1/4" for the jointer/planer.
The boards I worked with yesterday were flat and smooth at 15/16" and since it was for just a planter, I left it like that.
Sorry for the long story, my question is:
How much you add for planing?
It made me realize that I am maybe too generous while milling. For 1" board I move the log up 1 3/8" since the chain kerf takes 3/8", the idea was to have 1/4" for the jointer/planer.
The boards I worked with yesterday were flat and smooth at 15/16" and since it was for just a planter, I left it like that.
Sorry for the long story, my question is:
How much you add for planing?