Here's a couple pics of a removal I did 3 weeks ago. I only had 2 shots left on the roll of film and needed to use it up.
We started about 9AM. I set my ropes and cleared over the power lines first, because they were over a Dr's office parking lot. I ran the hand line through two different crotches to give me two landing areas on opposite sides of the tree. Landing area was about 10'X14' for most of the stuff.
This is after my first tank of fuel in my climbing saw.
We started about 9AM. I set my ropes and cleared over the power lines first, because they were over a Dr's office parking lot. I ran the hand line through two different crotches to give me two landing areas on opposite sides of the tree. Landing area was about 10'X14' for most of the stuff.