I picked up some pallets this morning and added some side boards then loaded them up. I had to cut the size down to 36" high as the first one I made was 4' tall and the tractor couldn't lift it! Oh well, once the wood is drier maybe I can fill it up, in the mean time the 36" will have to suffice. I try to cut and split fairly large pieces, they are a minimum of 24" up to 30" long. It's mostly red Oak with some Maple and Ash thrown in.
Almost forgot the pic
Almost forgot the pic