Well there is something that can be learned from this. Plan better and know! Seems to me the rigger or crane driver must have made a profound error about the load size and/or position of crane / stabilisers / counterweights. Alternatively they stuck a stabiliser through an underground cavity of some kind. Gut turning stuff to watch.