I agree about the 3 way wedge, looks neat, can see the benefit of it but the side stress makes me doubt the durability. How is the splitter holding up?
Another thing I don't see often, is the oil tank (down) under the engine :msp_biggrin:
Here is 2 cord that was stacked till something around 4 am. My mum insisted in helping with stacking a few month back so I let her stack these 2,5 rows. One side against the building, the other against another stack, stacked in the opposite way. I told her to stack it as good as possible because they get sun most of the day and the wind blows through them from the opposite side. After the first row, I asked here to stop because it was already leaning (the wrong way), but she wouldn't listen and it all needed to go fast fast fast. So I guess I have some extra work after my exams. I still need to split and stack 7 cords, stack another 1,5 cord + these 2 cords and I've only got 10 days before I leave on holiday with my gf.
At least I'm not bored :bang:
View attachment 299035
Another thing I don't see often, is the oil tank (down) under the engine :msp_biggrin:
Here is 2 cord that was stacked till something around 4 am. My mum insisted in helping with stacking a few month back so I let her stack these 2,5 rows. One side against the building, the other against another stack, stacked in the opposite way. I told her to stack it as good as possible because they get sun most of the day and the wind blows through them from the opposite side. After the first row, I asked here to stop because it was already leaning (the wrong way), but she wouldn't listen and it all needed to go fast fast fast. So I guess I have some extra work after my exams. I still need to split and stack 7 cords, stack another 1,5 cord + these 2 cords and I've only got 10 days before I leave on holiday with my gf.
At least I'm not bored :bang:
View attachment 299035