beastmaster
Addicted to ArboristSite
I did this job a few weeks ago. The drive way was really steep, part of the crane was in the garage almost leval and the back was 6ft or more off the ground. the boom was almost straight up and down on must the picks. Because of the angle most the pieces had to be lifted up to pick, I would place a facecut on top cut into it like a Dutchmen, then cut the back as the crane lifted it vertical. Others i found center on them and lift them. From start to finish the boom was almost always straight up and down. Job took 4 hours to do 2 oaks.View attachment 292902View attachment 292903View attachment 292905View attachment 292906View attachment 292901