Yooperforeman
ArboristSite Operative
Log cabin that my Dad and I are building.View attachment 199875View attachment 199876
copied from the other thread.....
Pretty sweet! Did you sand down the logs after it was built? How are the posts attached to the beams?
No, the logs were peeled by hand then air dried.After the walls were built,the whole building was pressure washed with bleach water.
After drying for a week,we then applied the stain and caulked the seams.Right now the building is just resting on the posts,it's not attached.
I'm going to use some angle iron and lag bolts to secure the beams to the posts.
Here's a close up of the log walls.View attachment 200133
Looks great. What did you use for caulking the seams?
Enter your email address to join: