ghitch75
ArboristSite Guru
there loggin' 200 acres down the road road from me....we hauled out 21 loads...got about 6 more loads to get out today.... the pile day 2 pic goes to the right about 40' more but couldn't backup far enough to get it all in the pic..
the JD 4300 has a 4in1 bucket on it just grab and go!
in that pic the pile when we started was at the last little tree to the center of the pic...
the JD 4300 has a 4in1 bucket on it just grab and go!
in that pic the pile when we started was at the last little tree to the center of the pic...
Last edited: