Bushmans
Smoke Dragon Herder
I have an upper deck on my bi-level so I fill under it with wood stacks and tarp it.
View attachment 217019
This is a summer pic but now its all full.
I also fill my garage with ready to go wood. Both are within 20 ft of the fireplace.
View attachment 217020
Then I stack a 4 ft row on each side of the fireplace three foot high and that lasts a work week and I restock from the other piles as needed.
Wood shed is being built this spring. 15x20 with a sheet metal roof.
View attachment 217019
This is a summer pic but now its all full.
I also fill my garage with ready to go wood. Both are within 20 ft of the fireplace.
View attachment 217020
Then I stack a 4 ft row on each side of the fireplace three foot high and that lasts a work week and I restock from the other piles as needed.
Wood shed is being built this spring. 15x20 with a sheet metal roof.