shelbythedog
ArboristSite Operative
I put screwnails in the lows beside the high ribs that go into the framing member and use shorter screws in the high rib laps that only hold the sheets together. We have an American Buildings dealer on here and I think he will tell you the same thing.
Can you provide a picture of this technique, I'm not able to grasp the concept thru your description. Screwing thru the high parts of the rib is something I've never seen in any fashion.