An empyre 200. Less than impressed with that unit after 4 years.What did you have before that?
I researched the hell out of it before buying and with what I learned from the previous boiler, the g200 was the best option I could find.I really hope it holds up for Ya', really do.
Nothing like dealing with junk, we ain't got the time.
It certainly is built much heavier than the empyre was. My little forklift needed some friends hanging on the back to lift it haha.I looked into them a while ago. Well built machine. I think you’ll be happy.
It's actually 2x2x1/4 square tubing that I welded to the feet of the boiler. The one rear leg of the boiler landed inside my 3'x4' "pit" (where the lines to the house run through the shop footer) that's under the boiler. So the square tubing let's the boiler straddle the opening and not fall in .Looks like a nice unit but one question. Why the round pipe under the legs? I would think it could roll.
Enter your email address to join: