Righto fellas, here's a potentially contentious musing, one most likely as stupid as a fence post.
If a reckless desperado hell-bent on legally parallel importing Stihl product into NZ and wholesaling it to a network of independant small engine shops themselves utterly aware of their obligations under our current trading rules surrounding parallel imported product, actually manged to get the first shipment through and onto the shelves of said retailers, how long would it take Stihl to plug the leak? Would a second and third shipment need to be on the water before the first one landed?