Between 10-12 hours for me, on my one. This is loading logs in sawhorse, bucking logs, loading trailer, unloading/stack rounds, splitting by hand, loading from a pile (sometimes straight from splitting into trailer), unloading/stacking. That is without the driving times but everything is 12" long and split small. A cord sure takes a lot of 12" sticks! This year I'm gonna do a part 16", for own use. Would be nice to have some company from time to time, probably a big difference in time also.
I want to change my way of working to loading the logs completely with a little crane (handle 1 log instead or 8 smaller logs, and a few logs at once), unload with crane (partly onto sawhorses, +-1cord at once), bucking, splitting and loading onto a pallet, partly unload pallets (haven't got enough pallets for all the wood) in a stacking area somewhere else. It should improve my efficiency and using the little crane should make it easy for me. Going to do some try-runs in February. I can also load the pallets for delivery, just gonna need more pallets!