Actually, all I really need to break through to the next level is a short, short KB that can tow. I would just run the big giant with that crew. That way it could do plywood/chipper positioning, grapple chipper duties, forwarding logs, etc.
A 21xp with full remote feed system would be ideal, but all things in time.
I really don’t even care about chipping as we go that much anyway. I did a crane job where the chip truck was boxed in, and when it got full it only took like 20 mins to run the heap of oak leaders, etc. they had piled up through after they were out and we had dumped. I was jamming tunes in the giant while doing so.
Yep, getting closer and closer.