I moved the pulleys around a lot in this. I took as big as would fit and it came down nice for the 2 guys on the ground, for me to. At one point I could have used a Gcrs but that was over quick any way. Its tough trying to tip tie big long limbs and cut from the bottom.
Aftet lunch and taking the top out of the one near the wires we pulled the last two tops right out. We were SO on target, cause we just fit both between the shed and cutleaf maple, awesome pulls from the groundguys ( wherever they got to this time)
I chunked " landflats" using different kinds of cuts, some where just straight through, snap, from the side,notch. etc. Nothing to big to go sliding off into the shed.