stinkbait
Addicted to ArboristSite
Has anyone checked the weather? It looks like a 50% chance of rain in Gold Hill, but I am still coming.
Has anyone checked the weather? It looks like a 50% chance of rain in Gold Hill, but I am still coming.
Hey Mustang, that's what happens when a little boy plays with big boy toys. Everyone of the saw chains and dogs that bite him I sharpened. And all of them were mine, he was playing with real men's stuff and they got him. I horse laughed him every time he whined about getting stuck or cut. He's so dramatic he was yelling and hollaring like he was going to bleed to death and it was just a scratch. What a wimp. I've told him hundreds of times to leave my stuff alone.
He's got my shop turned upside down and I can't find nothing and he never puts stuff back where it belongs. I've got some old bear traps that I'm going to surround my saws with and see if that will keep him out of um.
Yeh, we've having all this gorgeous weather this week and then the rain rolls in just in time for Saturday. But we can do something. Possum's got a nice size garage to hang out in and BS. We can cut between raindrops maybe... Or in the raindrops maybe.
Ahh, yea I looked at the weather the other day and it was 40 percent chance of showers. Typical NC weather I guess.
Oh well, Im not real scared of the rain. If it rains, we will improvise somethan.
Hey stinkbait, for the 2 man saws. Do you need the logs closer to the ground?
Cause if they are on the trailer they will be bout waist high, or so.
Wont be a problem to arrange somethan else for yall.
Alright stinkbait, Ill work on that friday then, about a 18-20 inch hardwood? 4inches off the ground
Ahh, no problem at all. Big John is gonna do most of the work. Well, all of the work, those hydraulics make my back feel so much better.
Good. I hope to get there a little early. I printed out the directions to your spot.
Logs are loaded up. First poplar is about 9", second is 12", and the red oak is about 16"
Tada, Im done with it. lol. Turn when you see that sign
Logs are loaded up. First poplar is about 9", second is 12", and the red oak is about 16"
Tada, Im done with it. lol. Turn when you see that sign
Logs are loaded up. First poplar is about 9", second is 12", and the red oak is about 16"
Tada, Im done with it. lol. Turn when you see that sign
Enter your email address to join: