Cowboy Billy
ArboristSite Operative
I posted on the logging form about my one man "Little logging" operation But once the wood is out of the woods I needed to make it usable. My friend Gary Stec came up with his wood-mizer to do some custom cutting for me. While the weather was great while I was cutting the trees down and hauling them out. It turned bad after. Gary's little boy was sick and it was cold and raining when sawed the wood up for me. Its great to have good friends
My friend Gary sawing a 20' long 8x8
Me and the cut and stacked wood.
This was about a 1/4 of what I cut and hauled out of the woods. But it was all I needed for the entry way for the trailer. I want to build a 12'x20' deck with four 8"x8"x20' long beams under it. So I can move it around after I build it. It will have a 12'x16' building built on it too with a hallway going into the trailer.
I am going to screw and glue 2x8 treated lumber to the bottom of the beams where they will sit on the ground. Since I want to get it done this year ( know I shouldn't hurry but) I am going to put it together wet and hope for the best. I am also going to screw and gleu the 1.5" lumber for the deck too. Where the building will be on it I am going to put 1" blue dow bord then 3/4 tougue and groove plywood.
I hope to get the rest of the wood cut up this winter. I have some nice knotty red pine That I want to use for paneling inside the room.
This is some of the wood I cut two years ago. White Birch and Red Pine boards I am going to make a table top with the red pine. I also have a Lot of white cedar
My friend Gary sawing a 20' long 8x8
Me and the cut and stacked wood.
This was about a 1/4 of what I cut and hauled out of the woods. But it was all I needed for the entry way for the trailer. I want to build a 12'x20' deck with four 8"x8"x20' long beams under it. So I can move it around after I build it. It will have a 12'x16' building built on it too with a hallway going into the trailer.
I am going to screw and glue 2x8 treated lumber to the bottom of the beams where they will sit on the ground. Since I want to get it done this year ( know I shouldn't hurry but) I am going to put it together wet and hope for the best. I am also going to screw and gleu the 1.5" lumber for the deck too. Where the building will be on it I am going to put 1" blue dow bord then 3/4 tougue and groove plywood.
I hope to get the rest of the wood cut up this winter. I have some nice knotty red pine That I want to use for paneling inside the room.
This is some of the wood I cut two years ago. White Birch and Red Pine boards I am going to make a table top with the red pine. I also have a Lot of white cedar